Lewiston ME: replace two sewer pump stations (Foss 2 and Sabattus) - submersible pumps, wet-well extensions, valve vaults, generators and electrical
This is a lump-sum construction contract to rebuild two small sewer pump stations. Most of the money goes to pumps, generators, VFD panels and electrical. Lindon could supply only the flanged ductile iron pipe and fittings, the valves, the precast barrel sections and vault, and the frames and covers. The packet sets no DBE/WBE goal.
At a glance
| Buyer type | Public agency · Maine |
|---|---|
| Closes | Closes within a month (buyer, contacts and documents inside) |
What this opportunity involves
This is a public-sector sewer pump station replacement (construction) - small di pipe / precast supply package to the prime opportunity from a Maine public agency. Qualified firms can respond with a proposal; the winner typically earns ongoing, renewable revenue on a multi-year public contract. We track and verify these, and can build the full response for you.
Full opportunity details
Is this one worth your time?
Working out whether you could be the one who wins it means reading the whole solicitation, and most of an afternoon disappears into a document that was never a fit. That is the part we do.
We read it end to end and tell you plainly whether you would be competitive, naming the requirement that decides it. If it is worth bidding we write the response, and you price it and sign it. If it is not, we say so and you have lost twenty minutes instead of a day.
Buyer, deadline, contacts and the files sit behind this for clients. Already a client? Log in.