By trade
How to get government painting contracts
Every housing authority repaints an apartment every time a tenant moves out. Every school district repaints a share of its classrooms every summer. Every city has fire stations, libraries and park buildings on a repaint cycle. None of that waits for a capital budget, which is why painting is one of the few public-sector trades where a contractor with a solid crew can hold a recurring contract within a year of deciding to try.
The catch is that almost none of it is advertised where painters look. It sits on housing authority websites, state procurement systems and district bid pages, bid by a small field of firms that learned the paperwork years ago. Painting is a low-bid trade, and the contractors who win know the lead-safe rules, price the unit-price schedule correctly, and hand in a bid with every certificate attached.
This guide covers who buys, what it pays, the gates, how bids are scored, where the work is posted, and when it is not worth your time.
On this page
The short version
- Housing authorities are the most reliable painting buyer. They bid as-needed unit-price contracts for vacant-unit turnover, one to three years with renewals, priced per apartment by bedroom count or per square foot.
- Pre-1978 housing is the gate. EPA RRP firm certification (300 dollars, five years) and a certified renovator on every job are the floor; HUD-assisted housing adds the Lead Safe Housing Rule, with trained workers and clearance testing.
- Public painting is scored as low responsive bid on a unit-price schedule. Qualifications are pass or fail before price is opened; a missing certificate or unsigned addendum is a rejection, not a deduction.
- Prevailing wage applies almost everywhere: Davis-Bacon on HUD-funded modernization over 2,000 dollars, HUD-determined maintenance rates on turnover work, and a state schedule on top in most states. School painting is bid in winter and painted in summer.
Who buys painting in the public sector, and how they order it
Housing authorities
Authorities are the steadiest buyer because their demand is created by tenants leaving. Most contract turnover painting on an as-needed basis with unit prices by apartment type. A New Jersey authority with roughly 390 units across six sites bid its turnover painting in early 2026 as a two-year contract priced per apartment by square footage, from 342 to 1,906 square feet. A central Massachusetts authority bid a two-year vacant-unit contract in April 2026 with a 150,000-dollar not-to-exceed value and the right to award to several contractors.
The New England examples in our own catalog this month are typical: one authority's as-needed painting of vacant one- to five-bedroom apartments at about 100,000 dollars a year, and another's annual painting and related-repairs contract at 58,500 dollars, one year with two optional renewals. how to win public housing authority contracts covers how these agencies buy.
School districts
Districts repaint in summer because the buildings are empty: corridors, classrooms, handrails, doors and frames, bid as fixed-price projects per building or group. A large metro Atlanta district's summer 2026 painting project covered fifteen schools, held its pre-bid on January 13, closed on February 10 and required a five percent bid bond. See how to sell to school districts.
Municipalities, universities and hospitals
Cities buy painting as small line-item jobs, as annual service contracts, and as sections inside renovations. Campuses run term contracts for summer residence-hall turnover. Public hospitals paint under night-work, low-odor and infection control risk assessment (ICRA) constraints, which is a qualification to build before it is a bid to chase. See how to sell to municipalities and city government, how to sell to universities and colleges and how to sell to public hospitals and health systems.
Pavement marking and bridges: a different trade
DOTs and counties buy pavement marking per linear foot by material from prequalified contractors who own striping trucks; an Illinois DOT District 1 marking letting in June 2024 drew four bidders and a low bid of 1,187,300 dollars. Bridge and steel coating is bid under AMPP QP 1 accreditation, with QP 2 for removing lead-bearing coatings.
What the contracts look like and what the specification asks for
| Contract shape | Where you see it | How it is priced | Term and size |
|---|---|---|---|
| As-needed unit-price contract | Housing authority turnover, campus term contracts, municipal annual painting | Per apartment by bedroom count or per square foot; hourly rate plus materials for extras; estimated quantities, not guaranteed | One to three years with renewals; 50,000 to 250,000 dollars a year |
| Fixed-price project | School summer programs, municipal buildings, exterior repaints | Lump sum per building, sometimes with a repair allowance | 45 to 90 days; tens of thousands to several hundred thousand dollars |
The as-needed contract is the one to build a business on. The Massachusetts authority's bid form estimated ten one-bedrooms at 400 square feet, ten two-bedrooms at 850, five three-bedrooms at 1,100, one four- and one five-bedroom, and set a second coat at 40 percent of the unit price. The contract then guarantees nothing: work orders arrive as units turn, you are expected on site within a stated window (an 80-unit New Jersey senior high-rise wanted each unit painted within 48 hours of notification), and you are paid per unit after the maintenance supervisor inspects it. See Unit price contract and IDIQ contract.
The specification, written to CSI MasterFormat 09 91 00 Painting (09 91 13 exterior, 09 91 23 interior, under 09 90 00 Painting and Coating), decides whether the unit price makes money. The New Jersey high-rise named three acceptable manufacturers and required the product data sheet with the bid; many specifications cite Master Painters Institute (MPI) product numbers, and "or approved equal" means approval before bid, not after award. California specifications follow South Coast AQMD Rule 1113 (flat coatings 50 grams per liter, nonflat 100), and OSHA's Hazard Communication standard puts a safety data sheet on site for every product.
The lead-paint gate: EPA RRP and HUD's Lead Safe Housing Rule
Most public housing was built before 1978, so most housing authority painting is renovation in target housing under EPA's Lead Renovation, Repair and Painting rule. It removes most painters from the field before price is opened.
RRP is the floor. To disturb painted surfaces for pay in pre-1978 housing or child-occupied facilities, which include older schools, your firm must hold EPA renovation firm certification (300 dollars, valid five years), assign a certified renovator to every job (an eight-hour initial course, four-hour refresher), and have every other worker trained by that renovator. Fifteen states, Massachusetts, Georgia, Oregon and Rhode Island among them, run their own programs in place of EPA's, and there the state license is what the bid form asks for.
The Lead Safe Housing Rule is the higher bar. When the housing receives federal assistance, HUD's rule at 24 CFR Part 35 sits on top of RRP and is stricter in four ways:
- Test kits cannot be used to say a surface is not lead-based paint. Only a certified lead inspector or risk assessor can, so you will be told to presume lead unless the authority has a report.
- All workers on the job, not only the supervising renovator, must complete HUD-approved lead-safe work practices training.
- Clearance at the end of the job is required unless the work is below de minimis size.
- Hazard control scales with assistance per unit: up to 5,000 dollars, lead-safe practices plus clearance; above 5,000, a risk assessment and interim controls; above 25,000, abatement by a certified abatement contractor.
The New Jersey solicitation put it in one line: surfaces identified as lead paint shall not be sanded.
Licensing, bonding and insurance: what is due with the bid
Painting licensing is a state-by-state patchwork. California requires a C-33 Painting and Decorating Contractor license from the Contractors State License Board on any job of 1,000 dollars or more, with four years of journey-level experience, trade and law exams and a 25,000-dollar contractor bond, plus Department of Industrial Relations registration to bid public works. Arizona issues C-34 (commercial), R-34 (residential) and CR-34 painting licenses and requires one over 1,000 dollars. A bid without the license number the form asks for is non-responsive.
Bid security and bonds
The thresholds are set by statute. Massachusetts requires a five percent bid deposit and a payment bond of 50 percent of the contract on public works under Chapter 30 Section 39M, which is exactly what both Massachusetts authorities in our examples required. Texas requires a performance bond on any public work contract over 100,000 dollars and a payment bond over 25,000 dollars (50,000 for municipalities) under Government Code Chapter 2253. Open a surety relationship before the first bid. bid bonds and performance bonds explained explains the mechanics.
Insurance and the checklist
Most solicitations require the insurance certificate in the bid package. The New Jersey authority's minimums were commercial general liability of 1,000,000 dollars per occurrence, automobile liability of 500,000 dollars, and workers' compensation per state law, with the authority named as additional insured. Also on most checklists: OSHA 10-hour cards, state business registration, references, and the paint manufacturer's data sheet. The New Jersey checklist ended with one sentence: failure to include these items will result in rejection of the bid. how to build an RFP compliance matrix is how experienced bidders keep that straight.
Prevailing wage and Section 3
Almost every public painting contract carries a wage schedule, and for a labor-heavy trade it is the biggest line in your price.
Davis-Bacon applies to contracts over 2,000 dollars for the construction, alteration or repair of public buildings, and the statute names painting and decorating explicitly. On housing authority work it attaches to development and modernization: Capital Fund repaints and painting inside a renovation.
HUD-determined maintenance wage rates apply under Section 12 of the U.S. Housing Act of 1937 to maintenance work, routine and non-routine, in public housing operations. Turnover painting paid from the operating budget usually falls here. The solicitation says which schedule applies; the New England authorities in our examples attached Davis-Bacon on federal units and the state schedule on state-aided units.
State prevailing wage applies to housing authority and school painting in most states regardless of federal funding, with weekly certified payroll, and increases during the contract are not a change order. Prevailing wage and Davis-Bacon for contractors covers the payroll mechanics.
Section 3 of the Housing and Urban Development Act of 1968, at 24 CFR Part 75, applies to public housing financial assistance regardless of amount and to other HUD-assisted construction over 200,000 dollars. For a painter it means reporting labor hours and a documented effort to hire low-income residents, against HUD benchmarks of 25 percent of hours to Section 3 workers and five percent to targeted Section 3 workers.
How painting bids are scored
Painting is a low-bid trade. On an invitation for bids the authority checks responsiveness first (forms, certificates, addenda, bid security), then responsibility (license, RRP certification, references, no debarment), and only then reads prices. Award goes to the lowest responsible and eligible bidder. See Responsiveness vs. responsibility and RFP vs RFQ vs IFB vs ITB.
On unit-price contracts, "lowest" means the extended total: each unit price times the authority's estimated quantity. If the authority estimates ten one-bedrooms and one five-bedroom, your one-bedroom price carries the bid. An unbalanced schedule, very low on the high-quantity line and high elsewhere, is visible at opening and most authorities reserve the right to reject it.
Qualifications-based scoring appears where the buyer issues a request for proposals: hospital systems, universities and large authorities wanting a term contractor for occupied buildings. There price is weighted at 40 to 60 percent against experience in occupied facilities, staffing and response time. See Qualifications-based selection (QBS).
Either way, the bid tabulation is a public record after opening. Request it every time you lose; knowing the winner priced a one-bedroom at 385 dollars against your 460 is the only market research in this trade worth having. how to request a debrief after losing a bid covers how to ask.
Where solicitations appear and what the calendar looks like
There is no single place where public painting is advertised, which is the main reason the field is thin.
- Housing authority websites. Most post solicitations on a procurement page, and many still take sealed paper bids. HUD Procurement Handbook 7460.8 governs how they buy.
- State procurement systems. COMMBUYS in Massachusetts, Cal eProcure in California, the Electronic State Business Daily in Texas and their equivalents carry state agency painting and, in several states, local and authority notices.
- District and municipal bid pages. Larger districts and cities use hosted bid systems such as PlanetBids, Bonfire, BidNet Direct and DemandStar, which need registration by commodity code.
- Cooperative and job-order contracts. Some cooperatives hold painting job-order contracts members can use without bidding. See cooperative purchasing for vendors: what a co-op contract actually costs you.
School painting for June through August is advertised between January and April, with bids due three to five weeks after posting, board approval two to six weeks later, and a notice to proceed timed to the last day of school. Housing authority contracts are advertised on a rolling basis tied to each authority's fiscal year; the ones in our catalog were posted in late summer for October starts.
A painter serving a 60-mile radius in the Northeast is inside the territory of a dozen housing authorities, thirty districts and fifty municipalities. That is the job we do for clients: we find the work you can win, tell you why it fits, and write the response. What is open today is on the opportunity hub.
What wins, what loses, and when to walk away
Because scoring is low bid, the winners are the contractors whose real cost is lowest, and in painting that comes down to four things.
- Crew production rate. A crew that can prime and two-coat a 400-square-foot one-bedroom in a day, at the prevailing rate, prices 20 percent under a crew that takes a day and a half.
- Take-off accuracy. On fixed-price school work the difference between winning and losing is usually whether you counted the doors, frames, handrails and stained wood that has to be sanded and refinished.
- Prompt turnover. Authorities lose rent every day a unit sits empty. A contractor who shows up inside the notification window and passes inspection the first time gets the renewal.
- References that match. Three years in business was the minimum at the New Jersey high-rise, and three references from occupied multifamily or institutional buildings is what most authorities read for.
The losses are almost always procedural: a missing insurance certificate, an unacknowledged addendum, a blank line on the bid form, an expired RRP certificate. how to respond to an RFP walks through a submission that survives the checklist.
When it is not worth it
Pass if your crews are mostly residential repaint and have never worked at a prevailing rate, because the wage schedule will make your unit prices uncompetitive until the crew is organized around it. Pass if you cannot carry 45 to 60 days of receivables, or cannot commit to a two- or three-day response window across an authority's portfolio. If the volume inside your radius is one authority and two districts, the cost to bid, covered in how much does it cost to bid on a government contract?, may not pay back for a year.
If you already run commercial crews, hold or can get RRP certification, and can staff a summer surge, this is a channel where a 100,000-dollar-a-year contract renews for three years and leads to the next one. If you would rather have someone find, vet and write the bids while you run the crews, book a call and we will walk through what is open in your territory and whether it is worth your time.
Common questions
Do I need EPA RRP certification to bid housing authority painting?
For any authority with housing built before 1978, which is most of them, yes: EPA renovation firm certification (or the state equivalent in the fifteen authorized states) with the bid, and a certified renovator on every job. HUD-assisted housing adds trained workers, clearance testing and a presumption of lead unless a certified inspector says otherwise.
Is public painting always awarded to the low bidder?
On invitations for bids, which is most housing authority, school and municipal painting, yes, to the lowest responsible and eligible bidder after the responsiveness and responsibility checks. Requests for proposals from hospitals, universities and some large authorities weight price against qualifications, typically at 40 to 60 percent.
What does a housing authority turnover painting contract pay?
It depends on turnover and unit mix. The examples in this guide run from roughly 58,000 dollars a year for a small authority's annual contract to about 100,000 dollars a year for as-needed vacant-unit painting at a mid-sized authority, to a 150,000-dollar not-to-exceed over two years.
Does prevailing wage apply to painting vacant apartments?
Yes, in almost every case. Turnover painting in public housing carries HUD-determined maintenance wage rates; painting inside a Capital Fund modernization carries Davis-Bacon; and most states apply their own schedule on top. Weekly certified payroll is part of the contract.
How much bonding do I need?
For as-needed contracts, bid security is usually five percent of the first year's estimated total and the payment bond 50 to 100 percent of it, so a 100,000-dollar annual contract needs a 5,000-dollar bid bond and a 50,000- to 100,000-dollar payment bond.
Sources
- EPA, Renovation, Repair and Painting Program: Firm Certification
- EPA, Lead Renovation, Repair and Painting Program
- EPA/HUD, Additional Requirements of HUD's Lead Safe Housing Rule for EPA Certified Renovation Firms
- 24 CFR Part 35, Lead-Based Paint Poisoning Prevention in Certain Residential Structures
- 24 CFR 75.3, Section 3 applicability
- HUD Handbook 1344.1 REV-3, Chapter 2, Labor standards in HUD programs
- HUD, Factors of Labor Standards Applicability (Davis-Bacon and HUD-determined maintenance wages)
- HUD Public Housing Procurement Handbook 7460.8, Chapter 6, Sealed Bids
- California CSLB, C-33 Painting and Decorating Contractor classification
- Arizona Registrar of Contractors, license classifications
- Texas Government Code Chapter 2253, Public Work Performance and Payment Bonds
- Massachusetts Office of the Inspector General, Public Construction Bidding FAQs (c.149 filed sub-bids)
- South Coast AQMD, Rule 1113 Architectural Coatings
- Housing Authority of the City of Perth Amboy, Painting Services RFP (2026)
- Worcester Housing Authority, IFB 26-13 Vacant Unit Painting (2026)
- Newton Housing Authority (NJ), Request for Bids, Painting Services
- Housing Authority of the City of Pittsburgh, Occupied and Common Area Painting Authority-Wide
- AMPP, QP 1 Field Coating Application accreditation
- Illinois DOT, contract 177-46630 pavement marking letting, June 2024