Coastal Carolina University replaces two boilers with 3,500 MBH condensing boilers at the Singleton energy plant
A design-bid-build lump-sum job (H17-SEBR-MA) to remove two boilers at CCU's Singleton Building energy plant in Conway, SC and install two 3,500 MBH condensing boilers in a phased approach. The State Engineer's cost range is $400,000–$490,000; bids are due 2:00 PM November 5, 2026, by hand or mail.
At a glance
| Buyer type | Public agency · South Carolina |
|---|---|
| Closes | Closes this week (buyer, contacts and documents inside) |
What this opportunity involves
This is a public-sector opportunity from a South Carolina public agency. Qualified firms can respond with a proposal; the winner typically earns ongoing, renewable revenue on a multi-year public contract. We track and verify these, and can build the full response for you.
Full opportunity details
Is this one worth your time?
Working out whether you could be the one who wins it means reading the whole solicitation, and most of an afternoon disappears into a document that was never a fit. That is the part we do.
We read it end to end and tell you plainly whether you would be competitive, naming the requirement that decides it. If it is worth bidding we write the response, and you price it and sign it. If it is not, we say so and you have lost twenty minutes instead of a day.
Buyer, deadline, contacts and the files sit behind this for clients. Already a client? Log in.